Extension of the cold rolling mill Voest – Alpine

in A - 4020 Linz / Austria

Services rendered by WoRart:

• Static calculations
• Blueprints for the steel construction
• Constructed volumn of steel approx. 200 tonnes

 
     

Project description:

In the course of the extension of the cold rolling mill in Linz / Austria a track was extended by a wing. Crane runway girders, media bridges and a new hall building were constructed.

The special aspects about this construction are the two gantry cranes with a load-bearing capacity of 40 tonnes each (range category H3, stressing group B6, span 32 metres). The calculations and the execution were done according to Austrian standards.

Constructor:
Voest Alpine AG
A 4020 Linz / Austria

Planned activity:
Static calculations, blueprints

Contract price: 600.000 Euro

Project period: 2005

Utilisation: Extension of a cold rolling mill